Compounds for Flame Retardant & Fire Resistant Cables

Storage
Compounds must be stored in closed and unbroken packaging avoiding exposure to sunlight and water absorption. Preliminary drying of the compounds before processing is obligatory if the package was damaged during the transportation (mechanical damage), or stored in humid conditions in open bags/containers (non-hermetic, after partial usage) or after long-term storage (over 6 months). Drying conditions: 2 – 4 hours at 60°C – 80°C.


Packaging
Compounds are supplied in natural or colored pellets. Available in 30 kg plastic bags, 700 kg big bags, carton octabins.

 

Disclaimer
The description and figures contained herein are provided to customers as a general information for the purposes the product is intended for. These reflect Firm “DKR-group” Ltd. knowledge at the time of publication. By the information contained herein Firm “DKR-group” Ltd. won’t release any warranty and/or give any suggestion on the use of the product, or grant any franchise on existing patents. The end-user, transformer shall always check the specific suitability of the product for the purposes it is intended for and its compatibility with process specifications. This document does not form part of any contract with customer.